|
An excavator weighing 8 tons is on top of a flatbed trailer and heading
east on Interstate 70 near Hays, Kansas . The extended boom is made of
steel and the approaching overpass is made of commercial-grade concrete,
reinforced with 1 1/2 inch steel rebar spaced at 6 inch intervals in a
criss-cross pattern layered at 1 foot vertical spacing.
Solve: When the boom arm hits the overpass, how fast do you have
to be going to slice the bridge in half?? (Assume no effect for headwind
and no braking by the driver...) Extra Credit: Solve for the time and
distance required for the entire rig to come to a complete stop after hitting
the overpass at the speed calculated above.? Yes, you can neglect
friction. |