Busy day yesterday —— started at Moms trailer by measuring the deck to see what I needed to finish off the opening where the lift had been. Ended up only needing two 2X6 boards five feet long.
I loaded the Ford up with as many trash bags as I could fit in it and took them home with me to leave in our bin to get picked up. I then went to Menards and bought some deck screws, a screw driver bit and had them cut a 2X6X10 in ½ for me.
Then to Schnucks for some groceries as I have sorely neglected doing that lately. Tracey called before I got out of town so I gave her a ride to the old clinic to pick up some stuff there that still needed to be moved to the new clinic. Really had a load with lumber, groceries and her clinic stuff.
After Tracey got home she took a short snooze on the couch and then we went back to the trailer to put the trash can back from the curb but somebody had already done that; I suspect one of the neighbors but maybe brother Alan did it?
We spent about a ½ hour removing the temporary board across the deck opening and a couple other boards around the opening.
Then screwed on the two boards I had brought across the top and bottom with the other three vertical 2X6 boards to cover the opening. Not the fanciest solution but it doesnt look too bad and will keep anyone from falling off the deck.