#KitchenRemodel Our appliances arrived at Lowes yesterday. Tracey has them scheduled to be delivered this coming Thursday. We need to check out the water line for the ice maker before they deliver and install the refrig.
Tracey got an email that our countertops should be in a week from this coming Monday and sent word to the installer so he could schedule a day to come over and screw them up too.
I have been compiling a list of runs, drips and errors from the installers and have found so many I got tired of taking pictures of them. Eventually most of them will get worked out.
The plan for today is to return the cover piece that was supposed to have been installed in the refrigerator opening. Besides the hassle of returning it there will be a 25% restocking fee. We will also have to order the corner trim to cover for that screw-up. Tracey will buy some sandpaper, steel wool and wood stain to fix the damage to our floor.
MjL 02 Mar 2019, 6:05 a.m.
#KitchenRemodel One year later and I am still furious at the incompetence of that installer and his crew. Hindsight is absolutely 20/20.