A worker stands beside mobile maschinery during the installation of the railway tracks in the NEAT Gotthard Base tunnel near Erstfeld, May 7th 2012. Crossing the Alps, the worlds longest train tunnel should become operational at the end of 2016. The project consists of two parallel single track tunnels, each of a length of 57 kilometers (35 miles). |