#1 Click this link to see Blog page --> 01/19/2015

#BathroomRemodel
Tracey and I went to Menard’s again yesterday looking for a corner sink vanity —— no luck. We spent some time on the Internet after we got home and later in the day Tracey and Aaron went to Lowe’s and Home Depot but neither place stocks anything in a corner design. Looking like we may have to buy something sight unseen and we always hate to do that.

The bathroom is about halfway demolished with only the toilet still functional. I suspect by the end of next weekend the entire room will be stripped bare and ready for rebuilding. Home renovations are always such a mess.

MjL

#2 Click this link to see Blog page --> 01/20/2015

#BathroomRemodel
Tracey and I spent last evening in the basement with a flashlight looking under ceiling panels to sort out where we will be running the drain and water pipes. We put together quite a list of parts and connectors. My assignment for today is to spend some time at Menard’s buying this stuff. Since we are a ways away from actually running the plumbing I won’t have to get it all just yet but I do need to get the valves and drain caps we need to finish tearing the bathroom apart.

MjL

#3 Click this link to see Blog page --> 01/21/2015

#BathroomRemodel
I spent about a half-hour at Menard’s yesterday sorting through the plumbing racks looking for the fittings we are going to need. I didn’t buy any of the pipe, just fittings.

MjL

#4 Click this link to see Blog page --> 01/22/2015

#BathroomRemodel
I met Tracey at Texas Roadhouse for supper after she got off work and then we went across the street to Lowe’s where we bought two cartons of vinyl flooring planks. I have never worked with this stuff so it should be interesting to see how it goes together and how well it looks, holds up, etc. It is looking like we have another weekend of remodeling ahead of us. Maybe even several.

MjL

#5 Click this link to see Blog page --> 01/25/2015

#BathroomRemodel
A quick breakfast at Bob’s and then picked up a few construction items at Menard’s before returning home. Tracey and Aaron finished stripping the old wall paneling, removed the sink vanity (which entailed cutting and plugging the drain and water supply lines) and then removing the toilet.

The bolts holding the toilet to the floor turned out to be real boogers and needed soaking in WD-40 and some muscle with vise grips and wrench.

Tracey finished out the evening by pulling nails and sanding the walls to knock down the worst of the glue that held the wall panels attached to the walls.

MjL

#6 Click this link to see Blog page --> 01/26/2015

#BathroomRemodel
Aaron and Tracey spent some time yesterday hauling some of the remodeling debris out to the burn pile and garbage bin. The hallway was beginning to get rather clogged. We have reached a minor impasse in our project, Tracey climbed up into the attic and discovered that the bathroom has a vent fan, but it is vented into the attic. Not good. We need to get it vented through the roof.

We also have some mold up there we have to deal with so I will be doing some Internet searches and phone calls to see if we can find somebody to help us. I’m not at all qualified to cut a hole in the roof to install a vent pipe.

MjL

#7 Click this link to see Blog page --> 02/15/2015

#BathroomRemodel
Tracey and I started the day yesterday with another trip to Menard’s. This time to get some lumber and electrical parts. We spent most of the afternoon cutting holes into the dry wall and putting in supports for the shower plumbing.

We called it a day after getting the shower water regulator and shower head pipes installed. The plan for today is to start putting in the supports for the sink and the plumbing. This project is going slow but we are getting there.

MjL

#8 Click this link to see Blog page --> 02/16/2015

#BathroomRemodel
We worked pretty steady yesterday morning on roughing in the wall support for the new sink. Also got a wire down from the attic and put a box in the wall for a new outlet. Tracey spent the afternoon doing the plumbing and had most of it done before supper.

Still a few connections to make but she ran out of corner pieces. She turned the water back on and it was all good from where she spliced into the main water lines to the shut off valves under the bathroom.

MjL

#9 Click this link to see Blog page --> 02/22/2015

#BathroomRemodel
Even though Tracey was wearing a red shirt on her away mission yesterday - she survived! She got her hair cut and purchased some drain pipe and fittings. There was a lot of trouble drilling the hole for the 1.5 inch drain pipe. The hole saw got in a bind while she was drilling and got destroyed. She finished the hole with a small hand saw and then a chisel. Can’t fault her determination to get the job done! By the end of the day she had all the drain line put together for the new sink.

I think today she will be testing the water lines for leaks and then putting the dry wall back up in the places she cut them out. She still hasn’t decided on what she is going to put up on the walls to finish them but it sounds like it will be some kind of water resistant paneling.

MjL

#10 Click this link to see Blog page --> 03/01/2015

We went to Menard’s again yesterday. It seems we have spent every Saturday morning there for the past six weeks or so.

This time we ordered the wall panels for the #BathroomRemodel. The panels should be delivered tomorrow. No idea what time because making an exact delivery time is something from the ancient past.

We will hope for some time tomorrow and hope that they don’t reschedule if somebody gets a hangnail or something.

MjL

#11 Click this link to see Blog page --> 03/02/2015

#BathroomRemodel
Tracey made a little more progress on the bathroom. After a trip to the attic and some wire splicing there is now a new functioning electric outlet in the bathroom on the wall near where the new sink will be installed.

We also managed to take apart and re-assemble the connections to the shower valve and it doesn’t leak this time. (third time is a charm!) All we needed evidently was more thread tape on the connections.

MjL

#12 Click this link to see Blog page --> 03/03/2015

#BathroomRemodel
I waited all day for Menard’s to deliver our wall panels for the bathroom. Who knew that “around noon” actually means 5 p.m. And then there was only one guy in the delivery truck. I felt badly for him but I paid good money to have the stuff delivered and didn’t offer to help him unload the truck. If I wanted to lug 4 x 8 sheets of paneling I would have hauled it home myself.

MjL

#13 Click this link to see Blog page --> 03/08/2015

#BathroomRemodel
We managed to get two walls covered with paneling after some cussing and second guessing. I can hardly believe how out of square the walls and ceiling are in that bathroom. And, of course, we have a pattern in the paneling so we have to match the pattern in both directions. I think we are going to need some wide trim.

MjL

#14 Click this link to see Blog page --> 03/15/2015

Tracey made great progress in the #BathroomRemodel yesterday, the floor is completely finished. There has been a snag in putting the toilet back in though. The seal between the tank and commode dried out and it leaked. The hardware holding them together is rusted tight and we couldn’t get it apart to replace the seal. After fussing with it for over an hour it has been decided we are getting a new toilet and tank.

Tracey spent a while on the Internet looking up toilet facts and statistics. There are ratings for how much water they use, how fast they flush, whether there is more water around the rim to clean the bowl or more water down the pipe to flush solids better. Etc. Etc. I’m afraid that is way more that I ever wanted to know about the science of toilet flushing.

MjL

#15 Click this link to see Blog page --> 03/16/2015

#BathroomRemodel
Busy day yesterday —— we went to two Lowe’s stores and Menard’s in Pekin before Tracey finally found a toilet that met her exacting specifications. The bathroom is now functional if not finished. The toilet and sink have been installed with no leaks and the door is back on. Still the shower stall, wall and door trim, medicine cabinet, and other things like towel rack and toilet paper holder. Looking good!

MjL

#16 Click this link to see Blog page --> 03/31/2015

Forgot to give you a #BathroomRemodel update —— the shower is installed! Aaron took the first shower late Sunday evening and there were no leaks discovered. Still a lot of trim work to be done but the essentials of sink, toilet and shower are all working. Although there have been some setbacks along the way Tracey has been getting this project done!

MjL